Some Of The Projects Executed With Our Partners:
<
Project Title |
Country |
Client |
Duration |
Status |
Rehabilitation, Design, Supply, Installation, Distribution, & Operation of Micro Hydro Electric Power Plant Project in Chack District, Wardak Province |
Afghanistan |
Ministry of Energy and Water of Afghanistan (MEW) |
36 Months |
Under Execution |
Design- build of Dahane Dara Dam and Hydro Power Generation Plant and Irrigation Network |
Afghanistan |
Ministry of Energy and Water of Afghanistan (MEW) |
62 Months |
Under Execution |
Tanzania 220/33 kV Substation Extension Design |
Tanzania |
Rural Energy Agency (REA) |
18 Months |
Under Execution |
EPC Construction of 220 kV |
Pakistan |
National Transmission and Despatch Company (NTDC) |
4 Years |
Completed |
EPC construction of 400kV |
Armenia |
High Voltage Electric Networks of Armenia (HVEN) |
18 Months |
Under Execution |
Rural Electrification EPC Project 33KV & LV Distribution Substations and Transmission Lines |
Sri Lanka |
Ministry of power and energy |
2 Years |
Completed |
Gas Transmission Project |
Armenia
|
HIGH VOLTAGE ELECTRIC NETWORKS (HVEN) |
2 Years |
Completed |
AL- Sadir 324 MW Power Plant |
Iraq |
Ministry of electricity Iraq |
2 Years |
Completed |
Construction of 225 KV & 30 KV Touba – Tobene – Kaolack Transmission Lines & Substations |
Senegal |
Senegal Electricity Company |
3 Years |
Completed |
Construction of 220 KV Transmission Lines and 220/132 KV GIS Substation in Gwadar |
Pakistan |
National Transmission and Despatch Company (NTDC) |
4 Years |
Completed |
Design, supply, installation, testing & commissioning of 140km 220 kV Dadu-Khuzdar double circuit transmission line and 220/132 substation in Pakistan |
Pakistan |
National Transmission and Despatch Company (NTDC) |
4 Years |
Completed |
Study, design, supply, installation, test, and commissioning of the wind farm in Pushkin-Pass, Armenia |
Armenia |
HIGH VOLTAGE ELECTRIC NETWORKS (HVEN) |
1 Year |
Completed |
Engineering, Procurement, Installation, and Commissioning of 50-MW wind farm in Pakistan |
Pakistan |
Alternative Energy Development Board (AEDB) |
|
Under Execution |
Design, Engineering, Supply of material and equipment; supervision on construction of 6×66/20 KV substations, Syria |
Syria |
Public Establishment for Distribution & Exploitation of Electrical Energy |
2 Years |
Completed |
Design, survey, geological studies, manufacturing, test, delivery, installation and commissioning of 330 KV and 220 KV overhead transmission lines and substations between Imishli, Ali Bayramli, and Astara in Azerbaijan |
Azerbaijan |
Azerenrji JSC |
2 Years |
Completed |
Extension of the 220 KV existing Substation in Bahir Dar, Gondar and Shehedi of Ethiopia |
Ethiopia |
Ethiopian Electric Power Corporation |
2 Years |
Completed |
4 Mobile Substations 132/11 KV in Kurdistan Region, Iraq |
Iraq |
Kurdistan Regional Government Ministry of Electricity |
2 Years |
Completed |
Engineering, Procurement, Installation and Commissioning of 3 x 132/11 and 3 x 33/11 KV mobile substations in Iraq |
Iraq |
Kurdistan Regional Government Ministry of Electricity |
2 Year |
Under Execution |
Design, supply, and supervision of Banes, Guanta, Jesus Menendez, La Maya & Palma Soriano water treatment plant and also the supply of equipment, including horizontal and deep well pumps, for Las Tunas, Camaguey, Havana and Holguin city pumping station |
Cuba |
Cuba Hidraulica |
2 Years |
Completed |
Design, supply and erection of hydro-mechanical, mechanical, and electrical equipment required for Al-Bab Tadef irrigation project on an area of 6700 hectares |
Syria |
General Organization for Land Development |
2 Years |
Completed |