Some Of The Projects Executed With Our Partners:

<

Project Title

Country

Client

Duration

Status

Rehabilitation, Design, Supply, Installation, Distribution, & Operation of Micro Hydro Electric Power Plant Project in Chack District, Wardak Province

Afghanistan

Ministry of Energy and Water of Afghanistan (MEW)

36 Months

Under Execution

Design- build of Dahane Dara Dam and Hydro Power Generation Plant and Irrigation Network

Afghanistan

Ministry of Energy and Water of Afghanistan (MEW)

62 Months

Under Execution

Tanzania 220/33 kV Substation Extension Design

Tanzania

Rural Energy Agency (REA)

18 Months

Under Execution

EPC Construction of 220 kV
Transmission Line and 220/132 KV Substation in Khuzdar Pakistan

Pakistan

National Transmission and Despatch Company (NTDC)

4 Years

Completed

EPC construction of 400kV
Transmission line and Substation in Armenia

Armenia

High Voltage Electric Networks of Armenia (HVEN)

18 Months

Under Execution

Rural Electrification EPC Project 33KV & LV Distribution Substations and Transmission Lines

Sri Lanka

Ministry of power and energy

2 Years

Completed

Gas Transmission Project

Armenia

HIGH VOLTAGE ELECTRIC NETWORKS (HVEN)

2 Years

Completed

AL- Sadir 324 MW Power Plant

Iraq

Ministry of electricity Iraq

2 Years

Completed

Construction of 225 KV & 30 KV Touba – Tobene – Kaolack Transmission Lines & Substations

Senegal

Senegal Electricity Company

3 Years

Completed

Construction of 220 KV Transmission Lines and 220/132 KV GIS Substation in Gwadar 

Pakistan

National Transmission and Despatch Company (NTDC)

4 Years

Completed

Design, supply, installation, testing & commissioning of 140km 220 kV Dadu-Khuzdar double circuit transmission line and 220/132 substation in Pakistan

Pakistan

National Transmission and Despatch Company (NTDC)

4 Years

Completed

Study, design, supply, installation, test, and commissioning of the wind farm in Pushkin-Pass, Armenia

Armenia

HIGH VOLTAGE ELECTRIC NETWORKS (HVEN)

1 Year

Completed

Engineering, Procurement, Installation, and Commissioning of 50-MW wind farm in Pakistan

Pakistan

Alternative Energy Development Board (AEDB)

Under Execution

Design, Engineering, Supply of material and equipment; supervision on construction of 6×66/20 KV substations, Syria

Syria

Public Establishment for Distribution & Exploitation of Electrical Energy
(PEDE)

2 Years

Completed

Design, survey, geological studies, manufacturing, test, delivery, installation and commissioning of 330 KV and 220 KV overhead transmission lines and substations between Imishli, Ali Bayramli, and Astara in Azerbaijan

Azerbaijan

Azerenrji JSC

2 Years

Completed

Extension of the 220 KV existing Substation in Bahir Dar, Gondar and Shehedi of Ethiopia

Ethiopia

Ethiopian Electric Power Corporation

2 Years

Completed

4 Mobile Substations 132/11 KV in Kurdistan Region, Iraq

Iraq

Kurdistan Regional Government Ministry of Electricity

2 Years

Completed

Engineering, Procurement, Installation and Commissioning of 3 x 132/11 and 3 x 33/11 KV mobile substations in Iraq

Iraq

Kurdistan Regional Government Ministry of Electricity

2 Year

Under Execution

Design, supply, and supervision of Banes, Guanta, Jesus Menendez, La Maya & Palma Soriano water treatment plant and also the supply of equipment, including horizontal and deep well pumps, for Las Tunas, Camaguey, Havana and Holguin city pumping station

Cuba

Cuba Hidraulica

2 Years

Completed

Design, supply and erection of hydro-mechanical, mechanical, and electrical equipment required for Al-Bab Tadef irrigation project on an area of 6700 hectares

Syria

General Organization for Land Development

2 Years

Completed